![]() |

| 21.11.87 |
HT |
9RM |
9RM |
-- |
ARCHWAY
STATION,
Kentish Town, Camden Town, Hampstead Road, Great Portland Street,
Oxford Circus, MARBLE ARCH (Monday-Saturday except
evenings)
Route introduced to replace withdrawn section of
137 between Oxford Circus and Archway.
![]() |
![]() |
| 05.11.88 |
HT |
10M |
8M |
-- |
Converted to One Person Operation.
| 07.10.89 |
HT |
11M |
10M |
-- |
ARCHWAY
STATION - MARBLE ARCH ( evenings)- VICTORIA
(withdrawn after pm peak)
Extended from Marble Arch to Victoria.
![]() |
| 09.11.91 |
HT |
11M |
9M |
7M |
ARCHWAY
STN - MARBLE ARCH (Monday-Saturday) - VICTORIA
(Monday-Friday peaks)
Marble Arch to Victoria projection reduced to
Monday-Friday peaks. Monday-Saturday
evening, and Sunday service introduced to partly compensate for service
27 withdrawal between Camden Town and Archway.
![]() |
![]() |
| 14.03.92 |
CF |
11T |
9T |
5T |
ARCHWAY
STATION - MARBLE ARCH
Monday-Friday peak extension from
Marble Arch to Victoria withdrawn.
| 24.10.92 |
CF |
11M |
9M |
5M |
Chalk Farm (CF) closure forces transfer to Holloway (HT)
02.09.00
Route withdrawn. Camden Town to Oxford
Circus section replaced by revised Route 88,
and the Archway to Warren Street section replaced by strengthened
service on Route 134.

T
Holloway
Changeover point Archway Station
CF
Chalk Farm
Changeover
point Camden Town. It should be noted as well that some late turn duties
went onto to Route
139 in the evenings.
Page modified Monday, February 16, 2009